Small loggers at the last taps, checked against the scheme's own schedule, with every miss sent to the person who can fix it.
Loggers record when water reaches the tail and at what pressure, the pump run is logged at the head, TailEnd gives each supply window a verdict, and the Junior Engineer gets a task with the likely cause whenever the tail misses out.
Four steps, from the last tap to a fix
Today, and with TailEnd
The "Today" column is drawn from the challenge statement and the 2024 Functionality Assessment for Assam. We'll walk through the real process with a PHED division during discovery.
What the Department asked for, and where to see it
| The challenge asks for | What TailEnd does | |
|---|---|---|
| A low-cost, scalable way to verify service at representative points, without household meters | Battery loggers on stand-posts or consenting households' spare taps at the tail and on high ground; a few fixed, the rest rotating every two weeks. | See it |
| Simple indicators: availability, duration and continuity, pressure compliance, water-quality status, abnormal-event alerts | Per window and per week: supply days, windows kept, minutes at pressure, chlorine at the farthest tap, and events. | See it |
| Drill-down for field action | Division → scheme → point → window, ending in a task for the JE with the trace and likely causes. | See it |
| Objective verification of actual delivery | Readings come from the logger at the tap, not from reports. The head logger or SCADA shows what was sent. | See it |
| Early identification of low-pressure or interrupted areas | A missed window raises an event within minutes of the window ending; a run of late windows goes on a watch list. | See it |
| Faster response and better accountability | Each event has a named officer, a clock and a closure note. The EE sees time to fix by scheme. | See it |
| Minimally intrusive, low-maintenance, suitable for intermittent communication | Nothing inside homes; designed to run for months on a battery; readings are stored and sent in bursts when a signal is found. | See it |
When a window counts as kept
| Test | Rule (starting point) | Why |
|---|---|---|
| On time | Water at the tail within 30 minutes of the window's start | People plan around the announced time |
| Long enough | Water for at least 75% of the window | A short window means households fill less |
| Enough pressure | At least 70% of those minutes above 7 m of head (0.7 bar) | Below that, a tap on a raised platform barely runs |
What the indicators mean
| Indicator | Measured as |
|---|---|
| Supply availability | Days in the week with any water at the point |
| Duration and continuity | Minutes with water per day; breaks within a window |
| Pressure compliance | Share of minutes with water above the threshold |
| Regularity | Windows kept, of those scheduled |
| Water-quality indicator | Residual chlorine at the farthest tap, weekly; 0.2 mg/L or more counts as present |
How a likely cause is suggested
| Pattern in the readings | Likely cause |
|---|---|
| Pump ran the full window, head normal, tail low throughout | Valve partly closed or wrongly set on that branch |
| Head pressure falls while the pump runs; nearby points also low | Leak or burst on the line |
| Tail fine at the start, falls as the window gets busy | Draw upstream, such as booster pumps on connections |
| Water arrives late, in spurts, after the line was empty | Air lock |
| Pump ran less than the window | Supply cut short at source: power or operation |
These rules and thresholds are starting points. PHED sets the real ones. Causes are suggestions in order of fit; the Junior Engineer records what they actually find, and those records are used to improve the order. The only automated reading is the chlorine comparator photo, and the Jal Mitra confirms every figure.
A missed window, from the tap to a fix
Chlorine at the farthest tap
A simple device, a field app, one set of records
What the logger does
Reads pressure every minute while water is present and every 15 minutes otherwise. Stores several weeks on board. Sends a short burst by GSM after each window and on events; LoRa to a village gateway where GSM is weak.
How it is fitted
On a T-joint with an isolation valve below a public stand-post or a spare tap, in a sealed, lockable box. Fitting is a short job for one plumber. Nothing is fitted inside a home.
What we still have to prove
Unit cost, battery life and sealing through a monsoon are design targets. Two hardware iterations are planned, with Dr Rupam Goswami's review.
Why not household meters
The challenge rules them out, and they aren't needed: a handful of well-placed points shows whether the tail is served.
Our live platform runs the same roles, approvals, photo capture and notifications engine. It can be hosted on the State Data Centre or a MeitY-empanelled cloud.
Access by role
Jal Mitras see their scheme, JEs their section, AEEs and EEs their sub-division or division. Officers sign in by OTP.
Nothing is overwritten
Readings, verdicts, tasks and closures are logged with who, when and which device.
Households' privacy
A household hosting a logger signs a consent form and can withdraw. Names and numbers are kept to the minimum and masked in reports (DPDP Act 2023).
Devices that are hard to tamper with
Sealed boxes, tamper and battery alerts, and a logger that goes silent becomes an event of its own.
What we'll settle with the Department in the first three weeks
The design rests on the challenge statement, the 2024 Functionality Assessment and public information on JJM systems. These are the points we'll confirm with a PHED division before building the production system.
- The pilot scheme, its pipeline map and its announced supply schedule.
- Where the tail and high-ground points are, walked with the JE and the Jal Mitra.
- The pressure threshold and the window rules PHED wants to use.
- Whether pump status comes from SCADA or from the Jal Mitra's log on that scheme.
- The WQMIS upload route for tail-end chlorine readings.
- Who acts on each kind of event where O&M sits with the Pani Samiti.